Archive - Aug 30, 2011

Possible Issues with Buffalo's Wastewater Plant

The City of Buffalo has found some possible issues with their new wastewater treatment plant, which has been finished less than a year.

Buffalo Investigating Second Raw Water Well

The City of Buffalo is considering digging a second raw water well near the existing well it already has west of town. The city is looking at expanding its raw water irrigation capacity and using the well as a backup for city drinking water if necessary.

Bison Sports Weekend Results

The Bison sports teams were in action over the weekend, and results were mixed.
The Lady Bison volleyball team was at the Douglas Invite and split their matches, going 2-2. Buffalo beat Cheyenne South in pool play 3-0 before losing to Douglas 1-2. In the tournament, the Lady Bison beat Newcastle and then lost to the eventual tournament champion Torrington.
Jenna Anderson and Kinzi Litzel led in attacking and blocking, and Sam Schroefel served 95% and had 86 assists for the tournament.
The girls will be at the Gillette Invite this Friday and Saturday.

Buffalo, Jo Co sign MOU For Fire Mitigation in Mosier Gulch

Fire mitigation in Mosier Gulch west of Buffalo will begin later this fall, after a Memorandun of Understanding, or MOU was signed between the City of Buffalo, Johnson County, the Bureau of Land Management and private landowners in the area.